Serial Number |
Patent Number |
Patent Title |
Grant Publication Date |
Country/Region |
Applicant Teacher |
1 |
LU500946 |
A Concrete Permeability Test Device and Test Method for Eliminattng Horizontal Circumferenttal Pressure |
2022-06-02 |
Luxembourg |
Du Jianmin |
2 |
2020101246 |
A Flexible Energy-Gathered Blasting Cutting Pipe Device and Its Application Method |
2020-07-29 |
Australia |
Luo Ning |
3 |
2020101351 |
A MEIM-based design method for full-area full-time support of roadway surrounding rock |
2020-12-02 |
Australia |
Tian Jiansheng |
4 |
2027102 |
A METHOD FOR CONSTRUCTING ARTIFICIAL GEOTHERMAL RESERVOIR BY REGIONALLY CRACKING HOT DRY ROCKS |
2022-06-27 |
Netherlands |
Gao Yanan |
5 |
2020101206 |
A Method for Explosive Welding of Zirconium-Based Metallic Glass and Lightweight Metal Plate |
2020-07-22 |
Australia |
Luo Ning |
6 |
2023/08178 |
A METHOD FOR IMPROVING THE ACCURACY OF LABORATORY SIMULATION OF ROCK FRAGMENTATION KINETIC ENERGY UNDER DEEP DISTURBANCE |
2024-03-27 |
South Africa |
Gao Yanan |
7 |
2021/10704 |
A partioned underground diaphragm wall capable of being used for phase change heat storage |
2021-01-01 |
South Africa |
Sun Meng |
8 |
10247001B2 |
Anti-spalling blocking bar for large cross-section coal gallery excvation work surface and supporting methold |
2019-04-02 |
United States |
Yang Shengqi |
9 |
2018386755 |
BLIND BOLT FASTENING DEVICE |
2020-11-13 |
Australia |
Chang Hongfei |
10 |
16/484,963 |
BLIND BOLT FASTENING DEVICE |
2020-11-02 |
United States |
Chang Hongfei |
11 |
3,050,897 |
COFFRAGE PERMANENT PLIABLE TRC POUVANT ETRE ASSEMBLE ET METHODE DE FABRICATION |
2021-06-22 |
Canada |
Yin Shiping |
12 |
2019/08153 |
Construction Method of High-Ductility Masonry Wall Having Reinforced Joint Mortar Layer |
2021-05-26 |
South Africa |
Yin Shiping |
13 |
2020257049 |
CONSTRUCTIONMETHODFORFORMINGWATER-PROOFGROUTINGCURTAININWATER-RICH POROUSROCKSTRATUMBYBLASTING |
2022-09-15 |
Australia |
Ren Yanlong |
14 |
AU2018357027 |
Deformation measurement device and method of conventional triaxial compression test of cuboid rock sample |
2021-09-23 |
Australia |
Yang Shengqi |
15 |
2023104415188 |
DEVICE AND METHOD FOR DETECTING LEAKAGE POINT OF VERTICALLY LAID HIGH-RESISTANCE IMPERMEABLE MEMBRANE |
2024-09-25 |
South Africa |
Zhang Qiang |
16 |
LU506357 |
DOUBLE-LAYER SHAFT LINING ASSEMBLED WITH STEEL MEMBERS ON OUTER LINING AND CONSTRUCTION METHOD THEREOF |
2024-08-09 |
Luxembourg |
Zhang Yu |
17 |
PT CP ZA00009499 |
ENERGY-ABSORBING ANCHOR CABLE FOR LARGE DEFORMATION RESISTANCE WITH ASSOCIATEDCONSTRUCTION METHOD OF UNDERGROUND ENGINEERING |
2024-07-31 |
South Africa |
Meng Bo |
18 |
202110245811.8 |
In-situ methane explosion shaped charge perforating device with molecular sieve |
2022-09-03 |
United States |
Luo Ning |
19 |
F/PTINC/O/2024/15051 |
INSUTSHESTING DEVICE:ANDSMETHODBASED ON MULTLSOURCEINFORMATION FOR OPTIMAL SUPPORT STRENGTH ROADWAY |
2024-01-01 |
Nigeria |
Meng Bo |
20 |
11932586B2 |
Liquid explosive for in-situ explosive fracturing in low-permeability oilfields and application thereof |
2024-03-19 |
United States |
Luo Ning |
21 |
2021/00642 |
METHOD FOR CONSTRUCTING CURTAIN BY GROUTING UNDERGROUD CONTINUOUS BLIND GROOVE IN BEDROCK RICH IN PORE WATER |
2021-09-29 |
South Africa |
Ren Yanlong |
22 |
2019/08450 |
METHOD FOR MANUFACTURING TRC PERMANENT FORMWORK WITH GRID INNER WALL |
2021-04-28 |
South Africa |
Yin Shiping |
23 |
2020/06633 |
METHOD FOR REPAIRING SHAFT LINING USING FROZEN SOIL CURTAIN |
2021-09-29 |
South Africa |
Ren Yanlong |
24 |
US 11,359,490 B2 |
Multifunctional intelligent tunneling device and method for simulating tunnel partial excavation |
2022-06-14 |
United States |
Wang Yingchao |
25 |
2018409645 |
Multifunctional intelligent tunneling device and method for simulating tunnel partial excavation |
2020-07-29 |
Australia |
Wang Yingchao |
26 |
F/PT/NC/O/2025/17337 |
Multifunctional simulation test system for stratum leakage and collapse under hydraulic action |
2025-05-14 |
Nigeria |
Wang Yingchao |
27 |
US10989638B2 |
Multi-functional support capable of transferring horizontal and multi-point local vertical load and implementation method |
2021-04-27 |
United States |
Chen Wei |
28 |
202110792902.3 |
PLC-controlled emulsification device for emulsified explosive test and its working method |
2023-07-14 |
Luxembourg |
Luo Ning |
29 |
2019382553 |
Prefabricated assembled staircase modular assembly mold and mounting method therefor |
2021-08-26 |
Australia |
Chang Hong |
30 |
US11034054B2 |
PREFABRICATED STAIRS MODULAR ASSEMBLY MOLD AND ASSEMBLING METHOD THEREOF |
2021-07-15 |
United States |
Chang Hong |
31 |
US11085860B2 |
Sealing pressing head for conventional triaxial test of cubold rocks with pre-existing fissures, and test method |
2021-08-10 |
United States |
Yang Shengqi |
32 |
US012326222B1 |
SEALING STRUCTURE OF UNDERGROUND HIGH-PRESSURE GAS STORAGE AND CONSTRUCTION METHOD THEREOF |
2025-06-10 |
United States |
Meng Bo |
33 |
US10794183B2 |
Self-drilling differential grouting combined bolt and anchoring method therefor |
2020-10-06 |
United States |
Xu Guoan |
34 |
2018331664 |
Self-drilling differential grouting combined bolt and anchoring method therefor |
2020-01-02 |
Australia |
Xu Guoan |
35 |
US 12276594 B2 |
SHAFT WALL PRESSURE CORROSION TEST SYSTEM |
2025-04-15 |
United States |
Han Tao |
36 |
3217077 |
SINGLE-LAYER SHAFT LINING WITH JOINT SEALING STRUCTURE AND GROUTING SYSTEM AND ITS CONSTRUCTION METHOD |
2024-06-11 |
Canada |
Yang Zhijiang |
37 |
2021/00601 |
TEST METHOD FOR NON-CONTACT MEASUREMENT OF WAVE VELOCITY OF ROCK IN FIDELITY ENVIRONMENT |
2022-01-26 |
South Africa |
Gao Yanan |
38 |
3,050,020 |
Testing system and method for measuring loss of particles in water inrush process in real time |
2021-09-28 |
Canada |
Wang Yingchao |
39 |
2019456680 |
Textile-reinforced concrete-steel pipe-FRP composite pipe and manufacturing method therefor |
2022-11-24 |
Australia |
Yin Shiping |
40 |
2018408668 |
TRC folded assemble-type permanent formwork and manufacturing method |
2020-11-26 |
Australia |
Yin Shiping |
41 |
2019/07932 |
TRC REINFORCEMENT METHOD FOR IMPROVING ANTI-EARTHQUAKE PERFORMANCE OF MULTI-PIECE BRICK MASONRY WALL |
2021-04-28 |
South Africa |
Yin Shiping |
42 |
US 12,234,657 B2 |
TRE ASSEMBLE PERMANENT COLUMN FORMWORK AND MANUFACTURING METHOD THEREOF |
2025-02-25 |
United States |
Yin Shiping |
43 |
2019259069 |
Underground space intelligent construction system and method |
2021-05-13 |
Australia |
Ma Zhanguo |
44 |
2736929 |
СКЛАДЫВАЕМАЯ НЕСЪЕМНАЯ ОПАЛУБКА ИЗ АРМИРОВАННОГО ТЕКСТИЛЕМ БЕТОНА (АТБ) СБОРНОГО ТИПА И СПОСОБ ЕЕ ИЗГОТОВЛЕНИЯ |
2020-10-23 |
Russia |
Yin Shiping |
45 |
2710694 |
One-sided Bolt Fastening Device |
2020-01-09 |
Russia |
Chang Hongfei |
46 |
US10941803(B2) |
One-sided Bolt Fastening Device (US Edition) |
2021-03-09 |
United States |
Chang Hongfei |
47 |
20227236187 |
Simulation Device and Testing Method for Deep Rock Mass Dynamic Disasters (Rockburst) |
2023-03-09 |
Japan |
Xie Lixiang |
48 |
2021104527235 |
Calculation Method for Bearing Capacity of Concrete Continuous Slabs under Various Boundary Conditions |
2022-05-25 |
South Africa |
Wang Yong |
49 |
202110200109X |
Floor Structure Composed of Prefabricated Modular Boxes |
2022-06-29 |
South Africa |
Wang Yong |